Siv and I have been putting up some guttering in the garden at the back of the new shed. After the heavy rain Friday night, we noticed a lot of water and mud sitting on the concrete from where the rain had run off the roof, which wouldn't be good for the wooden base over time. So it was a trip down to Wickes to get the relevant parts. In time we want to put a water butt at the end of the pipe.
Sunday, May 08, 2011
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment